DialTunTech

Programming TIMS (Traffic And Incident Management System) Gateway for Aberdeen and Cross Harbour Tunnels in Hong Kong

  • design and programming of SCADA system, which forms the interface between existing TCSS servers and server TIMS

  • programming a new SCADA system in WinCC OA 3.17

  • modification of existing SCADA systems in WinCC OA 3.06 and WinCC 5.1

icons_negative_international.png

TIMS System

Hong Kong

China

start:

march 2020

completion:

december 2020

Creating a complete tender documentation for technical solution for Zheleznitsa Tunnel

  • basic documentation analysis, complete system design based on valid EU norms

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

icons_negative_international.png

Tunnel Zheleznitsa

Zheleznitsa

Bulgaria

start:

april 2020

completion:

may 2020

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

  • support wih cabinets specification, calculation of individual components and with redundant power supply solution

  • specification of CCTV solution via Video OA app

  • specification of event management solution via our EMM module (Event Management Module), simultaneous integration in GIS at the WinCC OA platform

  • support with document creation for the tender

icons_negative_international.png

Central Kowloon Route

Hong Kong

China

start:

september 2019

completion:

february 2020

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, design of the network and device connection to the central system, support with document creation for the tender

icons_negative_international.png

Mina Tunnel

Abu Dabi

United Arab Emirates

start:

october 2018

completion:

december 2018

Preparation of the ITCC/Conduct+ Demo project of Siemens Munich ITS for Intertraffic Exhibition, Amsterdam

  • creating Demo Project using virtual computers, which represent PLC system (using Step7 TIA Professional v14) and SCADA system (using WinCC OA 3.14) with integrated simulator

icons_negative_international.png

Siemens AG (Intertraffic Amsterdam)

Munich

Germany

start:

october 2017

completion:

march 2018

Programming of modules for Central Control System of the highway tunnels

  • programming of modules EMM/GIS in WinCC OA 3.14

  • integration to the ITCC/Conduct+ system of the SIEMENS company

icons_negative_international.png

Liantang/Heung Yuen Wai Boundary Control Point Tunnel

Hong Kong

China

start:

march 2016

completion:

july 2017

Consulting in the tendering process

  • consultancy in the field of information system technologies and tunnel safety control

  • creation of binding documentation

icons_negative_international.png

Liantang/Heung Yuen Wai Boundary Control Point

Hong Kong

China

start:

september 2015

completion:

february 2016

Cooperation with SIEMENS’ international team on new engineering platform for highway and tunnel systems named VARIA

  • analysis and creation of database system for OS Win/Unix

  • interface between WinCC OA 3.16 and database system

  • support with creating communication protocols

icons_negative_international.png

VARIA System

Munich

Germany

start:

march 2020

completion:

september 2020

Designing and programming of subsystems for tunnel ventilation and lightning

  • basic documentation analysis and solution design

  • realization of ITCC solution on SCADA level using WinCC OA 3.14

  • integration of PLC – ITCC – Conduct+  highway redundant solution

icons_negative_international.png

Gradiška - Banja Luka Highway tunnels

Gradiška – Banja Luka

Bosnia and Herzegovina

start:

july 2019

completion:

april 2020

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

  • specification of the CCTV solution via Video OA app

  • specification of the event management solution via our EMM module (Event Management Module)

  • support with document creation for the tender

icons_negative_international.png

Kai Tak Tunnel

Hong Kong

China

start:

may 2019

completion:

november 2019

Modernization design of the control system

  • architecture design and RS components using PLC Simatic

  • network components design of redundant communication networks, including calculations of throughput, availability, and reliability of the networks

  • SIMATIC HMI panels design from KTP set for local control of tunnel and highway technologies

icons_negative_international.png

Cross-Harbour Tunnel

Hong Kong

China

start:

july 2018

completion:

august 2018

Automation system of tunnel fire ventilation with additional systems for traffic management

  • technology analysis and solution design covered by approved functional description of the system

  • PLC S7-400H / S7-1200 / WinCC OA / TP900 Comfort programming / PAC3200 configuration

  • network configuration using Scalance modules

  • communication with master OMCC SCADA system through CP343 using IEC 60870-5-104 protocol

  • communication with backup power supply system CBS (Central Battery System) using BacNet protocol

  • pre-FAT tests in our office, FAT tests in Leipzig at cabinets manufacturers’, commissioning in Qatar, SAT tests with the customer’s attendance

  • project management, creation of documentation for individual tests

icons_negative_international.png

Qatar Education City Tunnel

Doha

Qatar

start:

july 2016

completion:

august 2017

Consulting of the solution design and tendering process

  • consultancy in the field of highway information system technologies

  • solution design, creation of documentation

icons_negative_international.png

Highway D4 and Expressway R7

Bratislava

Slovakia

start:

august 2015

completion:

may 2016

Program adaptation for control and monitoring

  • S7-400

  • WinCC OA

icons_negative_international.png

Theatertunnel

Frankfurt

Germany

start:

august 2015

completion:

september 2015

Creating a complete tender documentation for technical solution for D4 Highway

  • complete information system design based on concession contract and legal norms

  • individual technological subsystems design, bill of quantities, calculation

  • central system design, bill of quantities, calculation

  • technical proposal for administration and maintenance of the highway information system

icons_negative_international.png

Section of D4 Highway

Skalka – Háje - Mirotice – Krašovice

Czechia

start:

november 2019

completion:

august 2020

Communication protocol development for traffic LED signs used in Australian ITS projects

  • protocol analysis based on TSI-SP003 ver. 5.0 specification, solution design

  • communication protocol development using C#, compilation into dll

  • integration to the SCADA platform WinCC OA 3.16 using standard interface CSI

icons_negative_international.png

Communication RTA Protocol

Sydney

Australia

start:

november 2019

completion:

february 2020

Implementation of changes into the Demo Project for International Exhibition

  • creating Demo Project using virtual computers, which represent PLC system (using Step7 TIA Professional v14) a SCADA system (using WinCC OA 3.14) with integrated simulator

  • implementation of new features by creating Dashboard in the third virtual computer using WinCC OA 3.16

icons_negative_international.png

ITS World Congress Singapore

Singapore

Singapore

start:

august 2019

completion:

september 2019

Consulting and helping with solution design and creation of documentation for tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

  • support with installation and optimalization of devices

  • support with quotation for tender process

icons_negative_international.png

Tseung Kwan O – Lam Tin Tunnel

Hong Kong

China

start:

january 2018

completion:

march 2018

Consulting and solution design for highway and highway tunnels

  • consultancy in field of highway and tunnel information system technologies

  • designing the solution, creating the documentation with approval by the customer, presenting the solution to the customer in Hong Kong

  • creating the documentation for central control system testing as well as testing of individual subsystems

icons_negative_international.png

Liantang/Heung Yuen Wai Boundary Control Point Tunnel

Hong Kong

China

start:

october 2016

completion:

july 2017

Consulting in the tendering process

  • consultancy in the field of information system technologies and tunnel safety control

icons_negative_international.png

Qatar Education City Tunnel

Doha

Qatar

start:

july 2015

completion:

march 2016

Conversion of SCADA system

  • conversion of the original SCADA system from PVSS (WinCC OA) into new Cimplicity 8.0 system

icons_negative_international.png

Sitina Tunnel

Bratislava

Slovakia

start:

july 2013

completion:

october 2013